Major Projects Completed

YEARNAME OF PROJECTCLIENTACTUAL SERVICES PROVIDED BY THE FIRM
2016Carrying out Traffic Management Survey for Lucknow Metro Phase 1A, LKCC 06 ProjectGulermak – TPL Joint Venture – Tata ProjectPreparation of Traffic Management Scheme during construction of Three Underground Metro Stations during phase –II of Lucknow Metro Rail Corporation Project at Hussain Ganj, Sachivalya and Hazrat Ganj Stations. Carrying out Traffic Surveys, Data Analysis, Road Network Inventory along proposed Diversion routes, capacity analysis and finalizing preparation of traffic diversion schemes as per the stipulations of IRC SP: 55- 2014, Guidelines on Traffic Management in Work Zones.
2016Construction of Green Field Six Lane Extradosed Cable Bridge over River Ganga Near Kachhi Dargah in Dist. PatnaDaewoo E & C Larsen and ToubroTraffic Studies including Classified Traffic Counts at Mid Blocks and Intersections, Road Side OD Surveys, Axle Load Surveys and Bankalman Beam Survey around the Newly proposed bridge to estimate the amount of diverted traffic likely on the proposed facility.
2016Preparation of Feasibility Study/DPR of selected road stretches for NH connectivity to Backward area/religious/tourist places schemes (i) Varanasi-Sindhora-jaunpur-Akbarpur-Ayodhya Road (ii) Mirzapur NH-35 – Aurai NH19.Holtec Consulting Pvt. Ltd.Traffic Studies include Classified TVC and OD Surveys, Intersection Volume Counts, Axle Load Survey and Speed and Delay survey.
2016Geometric Design of Eight Intersections along the Rajnagar Extension Road Connecting GT Road and NH-58, Ghaziabad.Ghaziabad Development Authority (GDA)Topographic Survey and Design of Intersection based on Turning Traffic Volumes.
2016Design of Service Road at Dasna Toll Plaza, GhaziabadGhaziabad Development Authority (GDA)Preparation of Engineering Design for service road to improve road safety around the Toll Plaza and suggest measures to facilitate traffic flow.
2016Design and development of drainage system of main burari road and swaroop nagar roadPWd delhiTopographic Survey and Design of Intersection based on Turning Traffic Volumes.
2016Concept Plans for grade separator and Geometric Design of Intersection along Mohan Nagar –Dabar Road in Ghaziabad.U.P. BCC, GhaziabadTopographic Survey and Design of Intersection based on Turning Traffic Volumes.
2016Concept plans for grade seprator and Geometric Design of Intersection between Rajnagar Extension bypass and NH-58 below the grade seprator, Ghaziabad .U.P. BCC, GhaziabadTopographic Survey and Design of Intersection based on Turning Traffic Volumes.
2016Design and construction of tunnel from start of underground ramp to end to underground ramp including three underground metro stations (viz. hussainganj, sachivalaya and Hazratganj) including Architectural finishes, E & M, TVS, ECS etc. on North-South corridor of Lucknow MRTS, Phase 1A project at LucknowTata ProejctPreparation of Traffic Management Scheme during construction of Eight elevated viaduct Metro Stations during phase –I of Lucknow Metro Rail Corporation Project at Transport Nagar, Krishna Nagar Singar Nagar, Alambagh, Alambagh Bus Stations, Maviaya, Durgapur and Charbagh Railway Stations. Carrying out Traffic Surveys, Data Analysis, Road Network Inventory along proposed Diversion routes, capacity analysis and finalizing preparation of traffic diversion schemes as per the stipulations of IRC SP: 55- 2014, Guidelines on Traffic Management in Work Zones.
2015Planning of Traffic Circulation scheme to Decongest Ito Junction.DMRC LtdResponsibility includes Traffic Analysis, Planning for Traffic Diversion at Construction Locations including Metro Stations along Ring Road for 14 Metro Stations. This is a feasibility report.
2015Corridor Improvement Proposal for Master Plan Road No. 01 Noida.Noida Development AuthoritySite reconnaissance, Topographic surveys, Traffic surveys, corridor improvement including improvement of cross sections within Right of way, intersection improvement and integration of Public Transport with road network. Special emphasis the pedestrian facilities suggesting facilities for IPT facilities was provided to improve their integration into corridor for improving safety and efficiency of pedestrian movement along the corridor.
2015Preparation of Feasibility Report for Two laning of State Highways (Package 15) – H1 (Mandari-Lassani), H2 (Jodhpur - Sojat), H3 (Jodhpur - Kamlighat), H4 (Baner - Kuchera) & H5 (Khirjan-Balesar), H6 (Kuchera - Pharod).Indian Technocrat LtdTraffic Studies and forecast of traffic along the newly constructed roads to justify investments on widening/strengthening of the new links in Jodhpur District of Rajasthan.
2015Survey and Design of Infrastructure Improvements on Accident Blackspot in Delhi.International Road Federation (IRF) ICT DelhiTraffic Surveys, Topographic Surveys and Preparation of Intersection. Improvement Plans to minimize accidents at the identified accident blackspot along selected arterial roads in Delhi.
2015Providing the Feasibility Study report including complete layout plan purposed detail drawing with fire accesses and easy approaches to the public, preliminary estimate with complete detailed specifications and scheme as per direction of Engineer-in Charge. (Skywalk)PWD DelhiPrepare a pre-feasibility study report for provision of a Skywalk connecting various buildings within the hospital complex in Central Delhi. The proposed Skywalk will be about 7 meters above the road and will link various work centers and hospitals within the hospital complex. The total length of 2.5 Km. and its width is 4 Meters. On the roof, solar panals have been placed to generate electricity.
2015Traffic Management Plan for Contract NC-02CEC INTERNATIONAL CORP INDIA PVT. LTD.Conducting Traffic survey, dala analysis report, speed and delay surveys etc.
2015Traffic Management Plan for Contract NC-03CEC INTERNATIONAL CORP INDIA PVT. LTD.Conducting Traffic survey, dala analysis report, speed and delay surveys etc.
2015Traffic Circulation scheme of Ramprastha SARE Realty Pvt. Ltd.Definti DesignTo advise the architects regarding traffic circulation for an upcoming township in Sector 92, Gurgaon. The scope of work included review of cross sections of roads in the complex ,review of the traffic circulation in the basement and at surface level , checking the adequacy of ramps to accommodate traffic during peak hours and redesign of road user information system to guide the users within the complex.
2015Topographic Survey, Geometric Design of Intersection and Corridor Improvement of road network in Village Kasna, Greater Noida.GR. NOIDA Industrial Development AuthorityReview of the physical Profile of the study area, Conduct of topographic surveys of the project road alignment Design of alignment and intersections including Grade separated facility across NH-91 , preparation of Broad Cost estimates This proposal had to be dovetailed with the Eastern Peripheral Expressway and NH-91 improvement projects .
2015Pre-Feasibility Study for new alignment (105 m wide road) and its intersection with NH-91, near Boraki Village Greater Noida.GR. NOIDA Industrial Development AuthorityReview of the physical Profile of the study area, Conduct of topographic surveys of the project road alignment Design of alignment and intersections including Grade separated facility across NH-91 , preparation of Broad Cost estimates This proposal had to be dovetailed with the Eastern Peripheral Expressway and NH-91 improvement projects .
2015Survey and Design (Corridor Improvement proposal for Master Olan Road No 01) NoidaNoida authorityReview of the of the study intersections, Conduct of traffic studies, topographic surveys , Design of intersections and preparation of Cost Estimates as per DSR
2015Feasibility Study for Alternative Highway to NH-31 between Gangtok, Sikkiim and West Bengal.SA INFRA PVT. LTD.Study of Existing alignment and traffic situation in the study area and forecast of traffic upto Horizon year. Estimation of likely diversion of traffic from existing route onto the new alignment by an using the IRC RUCS model. This traffic will be used in Financial model to estimate the likely Economic and Financial returns of the project.
2014Topographic Survey for 12 Intersection on 45m wide road along Noida Gr Noida Expressway NoidaNoida authorityConducting topographic survey, geometric design for the intersection.
2014Survey and Design of Corridor Improvement Proposal for Labour Chowk to NH-24, Parallel road to NH-24 and left turn towards sector 57 and 58 in sector 62 NoidaNoidaDelineation of PIA, Topographic survey of area flyover and preparation of concept plan and its approval and subsequent preparation of GAD of the intersection geometric design of road network in the project influence area.
2014Preparation of Traffic Diversion Plan during Construction of First Phase of LMRC between Airport and Charbagh Railway Station, Lucknow.Larsen and Toubro Infra, Lucknow Metro ProjectReview of the Profile of the Amausi- Charbagh metro corridor, Conduct of traffic studies, Design of alternate diversion schemes for the alignment, Geometric Design of Intersections along the diversion paths
2014Improvement proposal for 12 selected intersection along Arterial / Sub Arterial roads corridor in Noida.Noida Developoment AuthorityReview of the of the study intersections, Conduct of traffic studies, topographic surveys , Design of intersections and preparation of Cost Estimates as per DSR
2014Preparation of Detailed Project Report for Bhiwaji -Neemrana Link Road..Upham International CorporationStudy of Existing alignment and traffic situation in the study area and forecast of traffic upto Horizon year. Estimation of likely diversion of traffic from existing route onto the new Alignment by an using the IRC RUCS model. This traffic will be used in Financial model to estimate the likely Economic and Financial returns of the project.
2014Estimation of Greenhouse Gas Emission and Energy Consumption and Co benefits for sustainable Urban Transport ProjectEmergent ventures india pvt. Ltd.Conducting Traffic survey, dala analysis report, speed and delay surveys etc.
2014DPR for MRTS/RRTS Connectivity between Ahmedabad and Dholera.RITES LTD.Preparation for DPR for the Project.
2014Independent Engineer for the Development of the Badarpur Elevated Highway Project (Delhi-Agra Section) of NH-2 from km 16.100 to km 20.500 in the State of Delhi and Haryana on BOT (Toll) Basis (May 2009 – April 2012Louis Berger Pvt. Ltd.The work involved checking the traffic management plan and comment upon the improvements suggested by the concessionaire for solving the traffic problems arising out of modifications in design.
2014Preparation of Detailed Project Report for a new Urban Corridor in NagalandJoint Venture of Meinhardt International and Definity DesignReview of the Socio- Economic Profile of the study area, Conduct of traffic studies and forecast, Design of alignment, Cost Estimates and Economic analysis of project.
2013Preparation of Feasibility cum preliminary design for construction of standalone ring road/bypass for Nagpur City in the State of Maharashtra under NHDP Phase- VII.Upham International CorporationStudy of Existing alignment and traffic situation in the study area and forecast of traffic upto Horizon year. Estimation of likely diversion of traffic along the new alignment of ring road from existing radial routes to Nagpur City. The Travel Demand has been estimated using the CUBE Model. This traffic will be used in Financial model to estimate the likely Economic and Financial returns of the project.
2013Technical Consultancy services for conversion of Five Minor Underpasses across Noida-Greater Noida Expressway into major underpasses through push box technology.DIMTS LtdConducting traffic studies, topographic surveys and preparation of improvement proposals for proposed underpasses which are being widened to accommodate the crossing traffic on either side of Noida-Greater Noida Expressway in Noida.
2013Preparation of Master Plan of drainage of NCT DelhiPWD DelhiConducting topographic survey work using total station and digital global positioning system showing drainage, inventory invert levels and top level of drains etc.
2013Prepartation for Traffic Management/Diversion Plans for CC26R ProjectITD ITD CEM JVConducting Traffic Management/Diversion Plan for the Project
2013Construction of underpass by Box Pushing Technology under NH-24 Bypass between sector 62 & 63 Noida.DIMTS LtdConducting traffic studies, topographic surveys and preparation of improvement proposals for proposed underpasses which are being widened to accommodate the crossing traffic on either side of NH-24bypass between Noida (at sector 62) and Ghaziabad (Indirapuram).
2013Pre BID Advisory services for upgradation of NH-218 for length of 223 kms. between Bijapur and Homnabad in Karnataka.Samarth Infraengg Technocrats Pvt. Ltd.Pre bid Advisory services for analysis of base year traffic, its forecast and estimate of toll revenues in different scenarios to ena the concessionaire to decide on bidding for the project.
2012Traffic Surveys for preparation of details project report for Kottayam City Road Improvement ProjectStup Consultants Pvt Ltd.Traffic Surveys for preparation of details project report for Kottayam City Road Improvement Project
2012Preparation of Feasibility Report and DPR for Multi Storey Parking at 3 Metro Stations at Jaipur.Design Associates Inc.Planning the parking facilities for 3 stations at Jaipur based on traffic studies and estimating parking demand for each station.
2012Traffic Surveys, Analysis and Report Preparation for prebid services for Four laning of Obedullaganj Betul Section of NH-69 from km 2.800 to 8.300 and from km 20.700 to km 137.000 in the State of MP to be executed as bot project on DBFOT pattern under NHDP Ph IIISatra I man pvt. Ltd.Preparation of Traffic, Surveys, analysis and report preparation.
2012Traffic surveys for Mathura (U.P. Border) – Bharatpur- Bayana – Hindaun – Gangapur – Bhadoti Road In RajasthanSTUP ConsultantsConduct of Traffic studies Traffic data analysis, Traffic Forecast Report preparation
2012Preparation of Traffic Diversion Plan during Metro construction for section CC-15 for Kalkaji-Kalindi Kunj Section along Line 8 of Delhi Metro phase-3AFCONSPreparation of traffic diversion schemes along the Metro Route and Preparation of Area wide traffic management plan during construction.
2012Design of Road corridor (Road NO 06) between Mamura Village and NH-24 in NOIDANoidaEngineering design of Road corridor and also the intersections as well as improvement of cross-sections and grades.
2012Traffic Diversion Schemes for Ring Road corridor between Bhikaji Cama Place and Hazrat Nizamudding Station for Line 7 of the Delhi MRTS Phase – 3DMRCPreparation of traffic diversion schemes along the Metro Route and Preparation of Area wide traffic management plan during construction
2012Corridor improvement proposal for two roads corridor: between Labour chowk and Khoda intersection and design of U turn and access to underpasses on service road along NH-24NoidaTopographic surveys of both roads between labour chowk village and service road along NH-24 bypass near Khoda village and Redesign the cross section of both roads geometric design elements of the corridor and design of intersection along the corridors to solve traffic circulation problems within the influence area of the corridor
2012PET Survey for New Metro Corridor in and aroundthe Metropolitan City of Kolkata.RITES LTD.To prepare plans for traffic dispersal and integration at the proposed stations. To prepare traffic circulation plans for influence area of each station
2012Topographical detail survey in Noida Village and Drainage Water flow and design in Noida VillageNoida authorityThe work involved design of intersection along 45 m wide master plan road along eastern edge of to facilitate traffic circulation at these intersection.
2011Traffic Diversion Schemes for ring road corridor between Bhikaji cama place and Shalimar Bagh for Line 7 of the Delhi MRTS Phase – 3DMRCPreparation of traffic diversion schemes along the Metro Route and Preparation of Area wide traffic management plan during construction
2011Design of intersection as part of short term traffic engineering Measures for Agra, Allahabad, Mathura and MeerutUMTC Ltd.Preparation of design drawings of critical intersections in each of the cities as per the stipulations of IRC SP- 41“Design of at-grade intersections in Urban areas”
2011Traffic Estimation on Zirakpur Parwanoo road projectDesign aidCarrying out traffic surveys, Traffic demand forecasting, Economic analysis of network improvement as per irc guidelines
2011Traffic Impact Assessment study for DLF Mall of India in Sector 18 NoidaRITES LTDTraffic Studies, Data analysis and preparation of input for the four stage UTPS model.
2011Design of grade separated facililties for arterial and sub arterial road system near sector 18 and nithari village, Noida corridor and other facilities near sector 18 NoidaNoida authorityThe work involved design of intersection along 45 m wide master plan road along eastern edge of to facilitate traffic circulation at these intersection.
2010Planning the Jaipur Bypass as a part of Phase VII of National Highways Development Programme of NHAISa InfraResponsibility includes Traffic Analysis ,Estimation of Traffic Diversion on proposed Ring Road using Saturn software and Traffic forecast along the Proposed Ring Road to using the estimated diversion from existing regional road network around Jaipur city.
2010DPR for Mumbai Metro Rail Project Mahim BKS Airport Kanjur Marg Metro Corridor.RITES LTDPreparation for DPR for the Project.
2010Preliminary Project Report for parking of Road Improvement Project in Nainital, Uttarakhand.UDEC LTDPreparation of Preliminary report and concept plan and Data collection and parking requirement estimates
2009Traffic Survey and analysis for Patna Bakhtiyarpur projectMeinhardt consulting engineersResponsibility includes Traffic Analysis, Traffic Forecast along the project road of revenue.
2009Data collection on State road Network in Gujarat – Package 1Lea associates South Asia Pvt. Ltd.Preparaiton of Road Information system, Pavement Management System, Routne Maintenance Management System.
2009Comprehensive Mobility Plan for Ludhiana Traffic and Travel SurveysRITES LTDTraffic Studies, Data analysis and preparation of input for the four stage UTPS model.
2009Preparation of DPR-1 for BRT system in BhubaneswarRITES LTDPreparation a DPR for BRT System
2009Feasibility Study and preparation of Detailed Design for ‘Bus Rapid Transit System’ for Outer Ring Road in Bangalore City, Karnataka.RITES LTDResponsibility includes design of plan and profile of the BRTS corridor along the project road)
2009Transport Plan or Integrated Township along Taj Expressway.MEINHARDT CONSULTING ENGINEERResponsibility includes Traffic Analysis, Traffic Forecast along the different section of expressway using Saturn software and estimation of toll revenue along the project road)
2008Traffic and Transport Survey for Ambala Kaithal HighwayMEINHARDT CONSULTING ENGINEERResponsibility includes Traffic Analysis, Traffic Forecast along the different section of expressway using Saturn software and estimation of toll revenue along the project road)
2008Traffic Survey for proposed Bhopal ByPass roadZoom Development PVT LTD.Conduct of Traffic studies Traffic data analysis, Traffic Forecast Report preparation
2008Traffic Survey for proposed HPWD-Gurgaon Faridabad and Ballabgarh – Sona RoadZoom Development PVT LTD.Conduct of Traffic studies Traffic data analysis, Traffic Forecast Report preparation
2008Traffic Forecast for 6-lane fully access controlled Taj Expressway in the state of Uttar Pradesh (Project Length: 165 km)JP Associates NoidaResponsibility includes Traffic Analysis, Traffic Forecast along the different section of expressway using Saturn software and estimation of toll revenue along the project road)
2008Traffic Surveys work for the Design Consultancy services for six laning of the Gurgoan-Kotputli-Jaipur section of from km 107/000 to km 219/000 at nh-8 in the State of Haryana and RajasthanLouis berger consulting pvt. Ltd.Preparation of Classified traffic volumes counts and Road Side OD Surveys, Axle Load survey and Pedestrian countra etc.
2008Feasibility Study and Preliminary Design for 10-laning of fully access controlled Mohali – Phagwara Expressway (Closed Tolling System) to be executed under BOT on Design, Build, Finance, Operate (DBFO) Pattern (Total Length: 100 Km)Louis Berger Group GurgaonResponsibility includes Traffic Surveys, Traffic Analysis, Estimation of Traffic Diversion and projected traffic on the expressway using Saturn software along the project road)
2007Traffic Impact Assessment Study for DLF town Square Mall in Sector 18 NoidaRITES LTDTraffic Studies, Data analysis and preparation of input for the four stage UTPS model.
2007Traffic Impact Assessment study for DLF mall of india at NH-8 along Delhi-Gurgaon BorderRites ltd.Responsibility includes Traffic Analysis, Traffic Forecast along the project road and estimates of revenue.
2006Amusement Park, Noida: Traffic Management of our project vis-à-vis Noida Authority Master Plan on Traffic, on the outer roads of our Amusement ParkIrppl international recreation parks pvt. Ltd.Conduct of Traffic studies Traffic data analysis, Traffic Forecast Report preparation
2006City Bus servicesin Amritsar, Ludhiana and JalandharIL&FS INFRASTRUCTURE DEVELOPMENT CORPORATION LTDConduct of Traffic studies Traffic data analysis, Traffic Forecast Report preparation
2009Detailed project reports for Three Metro Corridors Kolkata for financial proposal for carrying out preparation of Traffic dispersal and Inter-modal integration plansRITES LTDTo prepare plans for traffic dispersal and integration at the proposed stations. To prepare traffic circulation plans for influence area of each station
2007Transport Demand Forecast study and development of an integrated road cum multi modal public transport network for NCT of DelhiRITES LTDCarrying out traffic surveys, Traffic demand forecasting, Economic analysis of network improvement as per irc guidelines
2007Design of Bus Rapid Transit Corridors in Delhi-Jamia-Tilak Nagar and Nizamuddin bridge Nand Nagri CorridorsRites ltd.Carrying out traffic surveys, Traffic demand forecasting, Economic analysis of network improvement as per irc guidelines
2006Conduction Household Interview Survey for Bangalore Metropolitan area for CTTP for BangaloreRITES LTDCarrying out house interviews surveys as per irc guidelines
2005Traffic and Transport plan for NoidaRITES LTDCarrying out traffic surveys, Traffic demand forecasting and Economic analysis of network improvement as per irc guidelines
2010Traffic circulation and transport infrastructure plan for Connaught place in the context of the proposed redevelopment of New Delhi Railway StationRITES LTDTo prepare alternative feasible conceptual layout plans for roads, junction, traffic circulation and transport interchange of the schemes developed by RITES Ltd. to meet the projected demand in the study Area and To prepared conceptual geometric layout plans for transport infrastructure proposals including design of grade separators and ad grade intersection for about 25 km road length at surface and 10 km of alternative road
2009Preparation of Feasibility Report for elevated sub urban rail corridor Churchgate-Virar- MumbaiRITES LTDTo prepare conceptual traffic diversion plans for about 24 proposed stations at surface level to direct the traffic during construction period. And To prepare traffic integration facilities for nine major stations and design of traffic circulation, pedestrian path and parking facilities
2009Preparation of Feasibility Study and Detailed Project report for proposed ROB/RUB on Railway crossing of Chandan Nagar/Brij Nagar JallandharMC JalandharFeasibility study of the project. Preparation of drawing and submission to UTTIPEC. Preparation of presentation on power point. Preparation of model of the project
2007Construction of Railway Underpass at Railway crossing between Shalimar Bagh and Azadpur Fruit MandiPWD DelhiPreparation of Geometric Design of the project
2007Underground Parking for DHQ near South Block and North Block office complexesCPWDResponsible for Planning Traffic Surveys, Analysis of results preparation Traffic Management schemes in influence area of the underground parking structures system design of parking and internal circulations schemes in the complex
2007Traffic studies for High Capacity Bus System between Rajendra Place & Pragati Maidan in DelhiMOTT MacdonaldPlanning coordination of traffic studies. Preparation of Data Analysis report
2007Planning of Bus Routes along densely developed roads in cities of Amritsar, Jallandhar and Ludhiana on Public- Private Partnership basis.ILFS, IDCPlanning of bus routes along densely developed roads in cities of Amritsar, Jallandhar and Ludhiana on Public-Private Partnership basis.
2007Traffic studies for High Capacity Bus System between Jamia – Tilak Nagar in DelhiRites Ltd.Planning coordination of traffic studies and Preparation of Data Analysis report
2006Traffic Impact Assessment of two malls and Theme parks in NOIDAIRPPL Pvt LtdTraffic Studies ,Parking Studies , Impact Assessment , Impact Mitigation,
2006Widening and strengthening of NH-4 between Hoskote and Mulbagal in KarnatakaNHAITraffic Studies, Data Processing, Traffic Forecast, Economic Analysis and Report Writing
2006Feasibility Study and Detailed Project Report for Four/Six laning from Bangalore-Hoskote-Kolar-Mudbagal of NH-4 in the State of Karnataka under NHDP Phase III ProgrammeNHAICollection and analysis of traffic data for rural road network and related data on socio-economic base line; Review of DPR; Confirm Sub-project identification and techno-economic screening procedures for Phase 2 & 3, selection of roads and Preparation of relevant reports
2005Implementation of Institutional Strengthening Strategy for Tamil Nadu State HighwaysSMEC (I) Pvt. Ltd.Collection and analysis of traffic data for rural road network and related data on socio-economic base line; Review of DPR; Confirm Sub-project identification and techno-economic screening procedures for Phase 2 & 3, selection of roads and Preparation of relevant reports
2004Independent Engineer (Traffic) for Widening and Strengthening of 93 Km Long Section of NH-45 between Tambaram and Tindivanam on Annuity Basis for MSV International Inc.National Highways Authority of IndiaReview of the traffic studies. Checking traffic forecast as estimated in the DPR for the project. Checking safety/incidence management measures planned during construction and operations stage by concessionaire.
Review of the Traffic Management plan during construction and in post construction stages.
Review of engineering designs of intersections, access control measures, toll plaza and bus bays and suggest suitable modifications, wherever necessary.
2004Feasibility study for improving the road network in Jawaharlal Nehru Port area in MumbaiJNPT AuthorityCarrying out traffic surveys, Traffic demand forecasting, Economic analysis of network improvement as per irc guidelines
2003Preparation of Detailed Project Report for widening and strengthening of NH-24 Bypass between Km 3.400 and Km 8.500 in DelhiPWD, DelhiCarrying out traffic surveys, Data-analysis and interpretation, Design of At-grade and Grade separated intersections and Carrying out the economic analysis of the project.
2003Household Surveys for Preparing DPR for Bangalore MRTS, Govt. of KarnatakaRITES Ltd.Planning of surveys including the design of survey format, sampling scheme, selection of households for survey, training enumerators and conducting pilot surveys Customized programmes to analyze the household and travel characteristics of commuters in Bangalore.
Involved in interpretation of analyzed data and report preparation.

TPA Engineering Consultancy (I) Pvt. Ltd Since 1992