Major Projects Completed
| YEAR | NAME OF PROJECT | CLIENT | ACTUAL SERVICES PROVIDED BY THE FIRM |
| 2016 | Carrying out Traffic Management Survey for Lucknow Metro Phase 1A, LKCC 06 Project | Gulermak – TPL Joint Venture – Tata Project | Preparation of Traffic Management Scheme during construction of Three Underground Metro Stations during phase –II of Lucknow Metro Rail Corporation Project at Hussain Ganj, Sachivalya and Hazrat Ganj Stations. Carrying out Traffic Surveys, Data Analysis, Road Network Inventory along proposed Diversion routes, capacity analysis and finalizing preparation of traffic diversion schemes as per the stipulations of IRC SP: 55- 2014, Guidelines on Traffic Management in Work Zones. |
| 2016 | Construction of Green Field Six Lane Extradosed Cable Bridge over River Ganga Near Kachhi Dargah in Dist. Patna | Daewoo E & C Larsen and Toubro | Traffic Studies including Classified Traffic Counts at Mid Blocks and Intersections, Road Side OD Surveys, Axle Load Surveys and Bankalman Beam Survey around the Newly proposed bridge to estimate the amount of diverted traffic likely on the proposed facility. |
| 2016 | Preparation of Feasibility Study/DPR of selected road stretches for NH connectivity to Backward area/religious/tourist places schemes (i) Varanasi-Sindhora-jaunpur-Akbarpur-Ayodhya Road (ii) Mirzapur NH-35 – Aurai NH19. | Holtec Consulting Pvt. Ltd. | Traffic Studies include Classified TVC and OD Surveys, Intersection Volume Counts, Axle Load Survey and Speed and Delay survey. |
| 2016 | Geometric Design of Eight Intersections along the Rajnagar Extension Road Connecting GT Road and NH-58, Ghaziabad. | Ghaziabad Development Authority (GDA) | Topographic Survey and Design of Intersection based on Turning Traffic Volumes. |
| 2016 | Design of Service Road at Dasna Toll Plaza, Ghaziabad | Ghaziabad Development Authority (GDA) | Preparation of Engineering Design for service road to improve road safety around the Toll Plaza and suggest measures to facilitate traffic flow. |
| 2016 | Design and development of drainage system of main burari road and swaroop nagar road | PWd delhi | Topographic Survey and Design of Intersection based on Turning Traffic Volumes. |
| 2016 | Concept Plans for grade separator and Geometric Design of Intersection along Mohan Nagar –Dabar Road in Ghaziabad. | U.P. BCC, Ghaziabad | Topographic Survey and Design of Intersection based on Turning Traffic Volumes. |
| 2016 | Concept plans for grade seprator and Geometric Design of Intersection between Rajnagar Extension bypass and NH-58 below the grade seprator, Ghaziabad . | U.P. BCC, Ghaziabad | Topographic Survey and Design of Intersection based on Turning Traffic Volumes. |
| 2016 | Design and construction of tunnel from start of underground ramp to end to underground ramp including three underground metro stations (viz. hussainganj, sachivalaya and Hazratganj) including Architectural finishes, E & M, TVS, ECS etc. on North-South corridor of Lucknow MRTS, Phase 1A project at Lucknow | Tata Proejct | Preparation of Traffic Management Scheme during construction of Eight elevated viaduct Metro Stations during phase –I of Lucknow Metro Rail Corporation Project at Transport Nagar, Krishna Nagar Singar Nagar, Alambagh, Alambagh Bus Stations, Maviaya, Durgapur and Charbagh Railway Stations. Carrying out Traffic Surveys, Data Analysis, Road Network Inventory along proposed Diversion routes, capacity analysis and finalizing preparation of traffic diversion schemes as per the stipulations of IRC SP: 55- 2014, Guidelines on Traffic Management in Work Zones. |
| 2015 | Planning of Traffic Circulation scheme to Decongest Ito Junction. | DMRC Ltd | Responsibility includes Traffic Analysis, Planning for Traffic Diversion at Construction Locations including Metro Stations along Ring Road for 14 Metro Stations. This is a feasibility report. |
| 2015 | Corridor Improvement Proposal for Master Plan Road No. 01 Noida. | Noida Development Authority | Site reconnaissance, Topographic surveys, Traffic surveys, corridor improvement including improvement of cross sections within Right of way, intersection improvement and integration of Public Transport with road network. Special emphasis the pedestrian facilities suggesting facilities for IPT facilities was provided to improve their integration into corridor for improving safety and efficiency of pedestrian movement along the corridor. |
| 2015 | Preparation of Feasibility Report for Two laning of State Highways (Package 15) – H1 (Mandari-Lassani), H2 (Jodhpur - Sojat), H3 (Jodhpur - Kamlighat), H4 (Baner - Kuchera) & H5 (Khirjan-Balesar), H6 (Kuchera - Pharod). | Indian Technocrat Ltd | Traffic Studies and forecast of traffic along the newly constructed roads to justify investments on widening/strengthening of the new links in Jodhpur District of Rajasthan. |
| 2015 | Survey and Design of Infrastructure Improvements on Accident Blackspot in Delhi. | International Road Federation (IRF) ICT Delhi | Traffic Surveys, Topographic Surveys and Preparation of Intersection. Improvement Plans to minimize accidents at the identified accident blackspot along selected arterial roads in Delhi. |
| 2015 | Providing the Feasibility Study report including complete layout plan purposed detail drawing with fire accesses and easy approaches to the public, preliminary estimate with complete detailed specifications and scheme as per direction of Engineer-in Charge. (Skywalk) | PWD Delhi | Prepare a pre-feasibility study report for provision of a Skywalk connecting various buildings within the hospital complex in Central Delhi. The proposed Skywalk will be about 7 meters above the road and will link various work centers and hospitals within the hospital complex. The total length of 2.5 Km. and its width is 4 Meters. On the roof, solar panals have been placed to generate electricity. |
| 2015 | Traffic Management Plan for Contract NC-02 | CEC INTERNATIONAL CORP INDIA PVT. LTD. | Conducting Traffic survey, dala analysis report, speed and delay surveys etc. |
| 2015 | Traffic Management Plan for Contract NC-03 | CEC INTERNATIONAL CORP INDIA PVT. LTD. | Conducting Traffic survey, dala analysis report, speed and delay surveys etc. |
| 2015 | Traffic Circulation scheme of Ramprastha SARE Realty Pvt. Ltd. | Definti Design | To advise the architects regarding traffic circulation for an upcoming township in Sector 92, Gurgaon. The scope of work included review of cross sections of roads in the complex ,review of the traffic circulation in the basement and at surface level , checking the adequacy of ramps to accommodate traffic during peak hours and redesign of road user information system to guide the users within the complex. |
| 2015 | Topographic Survey, Geometric Design of Intersection and Corridor Improvement of road network in Village Kasna, Greater Noida. | GR. NOIDA Industrial Development Authority | Review of the physical Profile of the study area, Conduct of topographic surveys of the project road alignment Design of alignment and intersections including Grade separated facility across NH-91 , preparation of Broad Cost estimates This proposal had to be dovetailed with the Eastern Peripheral Expressway and NH-91 improvement projects . |
| 2015 | Pre-Feasibility Study for new alignment (105 m wide road) and its intersection with NH-91, near Boraki Village Greater Noida. | GR. NOIDA Industrial Development Authority | Review of the physical Profile of the study area, Conduct of topographic surveys of the project road alignment Design of alignment and intersections including Grade separated facility across NH-91 , preparation of Broad Cost estimates This proposal had to be dovetailed with the Eastern Peripheral Expressway and NH-91 improvement projects . |
| 2015 | Survey and Design (Corridor Improvement proposal for Master Olan Road No 01) Noida | Noida authority | Review of the of the study intersections, Conduct of traffic studies, topographic surveys , Design of intersections and preparation of Cost Estimates as per DSR |
| 2015 | Feasibility Study for Alternative Highway to NH-31 between Gangtok, Sikkiim and West Bengal. | SA INFRA PVT. LTD. | Study of Existing alignment and traffic situation in the study area and forecast of traffic upto Horizon year. Estimation of likely diversion of traffic from existing route onto the new alignment by an using the IRC RUCS model. This traffic will be used in Financial model to estimate the likely Economic and Financial returns of the project. |
| 2014 | Topographic Survey for 12 Intersection on 45m wide road along Noida Gr Noida Expressway Noida | Noida authority | Conducting topographic survey, geometric design for the intersection. |
| 2014 | Survey and Design of Corridor Improvement Proposal for Labour Chowk to NH-24, Parallel road to NH-24 and left turn towards sector 57 and 58 in sector 62 Noida | Noida | Delineation of PIA, Topographic survey of area flyover and preparation of concept plan and its approval and subsequent preparation of GAD of the intersection geometric design of road network in the project influence area. |
| 2014 | Preparation of Traffic Diversion Plan during Construction of First Phase of LMRC between Airport and Charbagh Railway Station, Lucknow. | Larsen and Toubro Infra, Lucknow Metro Project | Review of the Profile of the Amausi- Charbagh metro corridor, Conduct of traffic studies, Design of alternate diversion schemes for the alignment, Geometric Design of Intersections along the diversion paths |
| 2014 | Improvement proposal for 12 selected intersection along Arterial / Sub Arterial roads corridor in Noida. | Noida Developoment Authority | Review of the of the study intersections, Conduct of traffic studies, topographic surveys , Design of intersections and preparation of Cost Estimates as per DSR |
| 2014 | Preparation of Detailed Project Report for Bhiwaji -Neemrana Link Road.. | Upham International Corporation | Study of Existing alignment and traffic situation in the study area and forecast of traffic upto Horizon year. Estimation of likely diversion of traffic from existing route onto the new Alignment by an using the IRC RUCS model. This traffic will be used in Financial model to estimate the likely Economic and Financial returns of the project. |
| 2014 | Estimation of Greenhouse Gas Emission and Energy Consumption and Co benefits for sustainable Urban Transport Project | Emergent ventures india pvt. Ltd. | Conducting Traffic survey, dala analysis report, speed and delay surveys etc. |
| 2014 | DPR for MRTS/RRTS Connectivity between Ahmedabad and Dholera. | RITES LTD. | Preparation for DPR for the Project. |
| 2014 | Independent Engineer for the Development of the Badarpur Elevated Highway Project (Delhi-Agra Section) of NH-2 from km 16.100 to km 20.500 in the State of Delhi and Haryana on BOT (Toll) Basis (May 2009 – April 2012 | Louis Berger Pvt. Ltd. | The work involved checking the traffic management plan and comment upon the improvements suggested by the concessionaire for solving the traffic problems arising out of modifications in design. |
| 2014 | Preparation of Detailed Project Report for a new Urban Corridor in Nagaland | Joint Venture of Meinhardt International and Definity Design | Review of the Socio- Economic Profile of the study area, Conduct of traffic studies and forecast, Design of alignment, Cost Estimates and Economic analysis of project. |
| 2013 | Preparation of Feasibility cum preliminary design for construction of standalone ring road/bypass for Nagpur City in the State of Maharashtra under NHDP Phase- VII. | Upham International Corporation | Study of Existing alignment and traffic situation in the study area and forecast of traffic upto Horizon year. Estimation of likely diversion of traffic along the new alignment of ring road from existing radial routes to Nagpur City. The Travel Demand has been estimated using the CUBE Model. This traffic will be used in Financial model to estimate the likely Economic and Financial returns of the project. |
| 2013 | Technical Consultancy services for conversion of Five Minor Underpasses across Noida-Greater Noida Expressway into major underpasses through push box technology. | DIMTS Ltd | Conducting traffic studies, topographic surveys and preparation of improvement proposals for proposed underpasses which are being widened to accommodate the crossing traffic on either side of Noida-Greater Noida Expressway in Noida. |
| 2013 | Preparation of Master Plan of drainage of NCT Delhi | PWD Delhi | Conducting topographic survey work using total station and digital global positioning system showing drainage, inventory invert levels and top level of drains etc. |
| 2013 | Prepartation for Traffic Management/Diversion Plans for CC26R Project | ITD ITD CEM JV | Conducting Traffic Management/Diversion Plan for the Project |
| 2013 | Construction of underpass by Box Pushing Technology under NH-24 Bypass between sector 62 & 63 Noida. | DIMTS Ltd | Conducting traffic studies, topographic surveys and preparation of improvement proposals for proposed underpasses which are being widened to accommodate the crossing traffic on either side of NH-24bypass between Noida (at sector 62) and Ghaziabad (Indirapuram). |
| 2013 | Pre BID Advisory services for upgradation of NH-218 for length of 223 kms. between Bijapur and Homnabad in Karnataka. | Samarth Infraengg Technocrats Pvt. Ltd. | Pre bid Advisory services for analysis of base year traffic, its forecast and estimate of toll revenues in different scenarios to ena the concessionaire to decide on bidding for the project. |
| 2012 | Traffic Surveys for preparation of details project report for Kottayam City Road Improvement Project | Stup Consultants Pvt Ltd. | Traffic Surveys for preparation of details project report for Kottayam City Road Improvement Project |
| 2012 | Preparation of Feasibility Report and DPR for Multi Storey Parking at 3 Metro Stations at Jaipur. | Design Associates Inc. | Planning the parking facilities for 3 stations at Jaipur based on traffic studies and estimating parking demand for each station. |
| 2012 | Traffic Surveys, Analysis and Report Preparation for prebid services for Four laning of Obedullaganj Betul Section of NH-69 from km 2.800 to 8.300 and from km 20.700 to km 137.000 in the State of MP to be executed as bot project on DBFOT pattern under NHDP Ph III | Satra I man pvt. Ltd. | Preparation of Traffic, Surveys, analysis and report preparation. |
| 2012 | Traffic surveys for Mathura (U.P. Border) – Bharatpur- Bayana – Hindaun – Gangapur – Bhadoti Road In Rajasthan | STUP Consultants | Conduct of Traffic studies Traffic data analysis, Traffic Forecast Report preparation |
| 2012 | Preparation of Traffic Diversion Plan during Metro construction for section CC-15 for Kalkaji-Kalindi Kunj Section along Line 8 of Delhi Metro phase-3 | AFCONS | Preparation of traffic diversion schemes along the Metro Route and Preparation of Area wide traffic management plan during construction. |
| 2012 | Design of Road corridor (Road NO 06) between Mamura Village and NH-24 in NOIDA | Noida | Engineering design of Road corridor and also the intersections as well as improvement of cross-sections and grades. |
| 2012 | Traffic Diversion Schemes for Ring Road corridor between Bhikaji Cama Place and Hazrat Nizamudding Station for Line 7 of the Delhi MRTS Phase – 3 | DMRC | Preparation of traffic diversion schemes along the Metro Route and Preparation of Area wide traffic management plan during construction |
| 2012 | Corridor improvement proposal for two roads corridor: between Labour chowk and Khoda intersection and design of U turn and access to underpasses on service road along NH-24 | Noida | Topographic surveys of both roads between labour chowk village and service road along NH-24 bypass near Khoda village and Redesign the cross section of both roads geometric design elements of the corridor and design of intersection along the corridors to solve traffic circulation problems within the influence area of the corridor |
| 2012 | PET Survey for New Metro Corridor in and aroundthe Metropolitan City of Kolkata. | RITES LTD. | To prepare plans for traffic dispersal and integration at the proposed stations. To prepare traffic circulation plans for influence area of each station |
| 2012 | Topographical detail survey in Noida Village and Drainage Water flow and design in Noida Village | Noida authority | The work involved design of intersection along 45 m wide master plan road along eastern edge of to facilitate traffic circulation at these intersection. |
| 2011 | Traffic Diversion Schemes for ring road corridor between Bhikaji cama place and Shalimar Bagh for Line 7 of the Delhi MRTS Phase – 3 | DMRC | Preparation of traffic diversion schemes along the Metro Route and Preparation of Area wide traffic management plan during construction |
| 2011 | Design of intersection as part of short term traffic engineering Measures for Agra, Allahabad, Mathura and Meerut | UMTC Ltd. | Preparation of design drawings of critical intersections in each of the cities as per the stipulations of IRC SP- 41“Design of at-grade intersections in Urban areas” |
| 2011 | Traffic Estimation on Zirakpur Parwanoo road project | Design aid | Carrying out traffic surveys, Traffic demand forecasting, Economic analysis of network improvement as per irc guidelines |
| 2011 | Traffic Impact Assessment study for DLF Mall of India in Sector 18 Noida | RITES LTD | Traffic Studies, Data analysis and preparation of input for the four stage UTPS model. |
| 2011 | Design of grade separated facililties for arterial and sub arterial road system near sector 18 and nithari village, Noida corridor and other facilities near sector 18 Noida | Noida authority | The work involved design of intersection along 45 m wide master plan road along eastern edge of to facilitate traffic circulation at these intersection. |
| 2010 | Planning the Jaipur Bypass as a part of Phase VII of National Highways Development Programme of NHAI | Sa Infra | Responsibility includes Traffic Analysis ,Estimation of Traffic Diversion on proposed Ring Road using Saturn software and Traffic forecast along the Proposed Ring Road to using the estimated diversion from existing regional road network around Jaipur city. |
| 2010 | DPR for Mumbai Metro Rail Project Mahim BKS Airport Kanjur Marg Metro Corridor. | RITES LTD | Preparation for DPR for the Project. |
| 2010 | Preliminary Project Report for parking of Road Improvement Project in Nainital, Uttarakhand. | UDEC LTD | Preparation of Preliminary report and concept plan and Data collection and parking requirement estimates |
| 2009 | Traffic Survey and analysis for Patna Bakhtiyarpur project | Meinhardt consulting engineers | Responsibility includes Traffic Analysis, Traffic Forecast along the project road of revenue. |
| 2009 | Data collection on State road Network in Gujarat – Package 1 | Lea associates South Asia Pvt. Ltd. | Preparaiton of Road Information system, Pavement Management System, Routne Maintenance Management System. |
| 2009 | Comprehensive Mobility Plan for Ludhiana Traffic and Travel Surveys | RITES LTD | Traffic Studies, Data analysis and preparation of input for the four stage UTPS model. |
| 2009 | Preparation of DPR-1 for BRT system in Bhubaneswar | RITES LTD | Preparation a DPR for BRT System |
| 2009 | Feasibility Study and preparation of Detailed Design for ‘Bus Rapid Transit System’ for Outer Ring Road in Bangalore City, Karnataka. | RITES LTD | Responsibility includes design of plan and profile of the BRTS corridor along the project road) |
| 2009 | Transport Plan or Integrated Township along Taj Expressway. | MEINHARDT CONSULTING ENGINEER | Responsibility includes Traffic Analysis, Traffic Forecast along the different section of expressway using Saturn software and estimation of toll revenue along the project road) |
| 2008 | Traffic and Transport Survey for Ambala Kaithal Highway | MEINHARDT CONSULTING ENGINEER | Responsibility includes Traffic Analysis, Traffic Forecast along the different section of expressway using Saturn software and estimation of toll revenue along the project road) |
| 2008 | Traffic Survey for proposed Bhopal ByPass road | Zoom Development PVT LTD. | Conduct of Traffic studies Traffic data analysis, Traffic Forecast Report preparation |
| 2008 | Traffic Survey for proposed HPWD-Gurgaon Faridabad and Ballabgarh – Sona Road | Zoom Development PVT LTD. | Conduct of Traffic studies Traffic data analysis, Traffic Forecast Report preparation |
| 2008 | Traffic Forecast for 6-lane fully access controlled Taj Expressway in the state of Uttar Pradesh (Project Length: 165 km) | JP Associates Noida | Responsibility includes Traffic Analysis, Traffic Forecast along the different section of expressway using Saturn software and estimation of toll revenue along the project road) |
| 2008 | Traffic Surveys work for the Design Consultancy services for six laning of the Gurgoan-Kotputli-Jaipur section of from km 107/000 to km 219/000 at nh-8 in the State of Haryana and Rajasthan | Louis berger consulting pvt. Ltd. | Preparation of Classified traffic volumes counts and Road Side OD Surveys, Axle Load survey and Pedestrian countra etc. |
| 2008 | Feasibility Study and Preliminary Design for 10-laning of fully access controlled Mohali – Phagwara Expressway (Closed Tolling System) to be executed under BOT on Design, Build, Finance, Operate (DBFO) Pattern (Total Length: 100 Km) | Louis Berger Group Gurgaon | Responsibility includes Traffic Surveys, Traffic Analysis, Estimation of Traffic Diversion and projected traffic on the expressway using Saturn software along the project road) |
| 2007 | Traffic Impact Assessment Study for DLF town Square Mall in Sector 18 Noida | RITES LTD | Traffic Studies, Data analysis and preparation of input for the four stage UTPS model. |
| 2007 | Traffic Impact Assessment study for DLF mall of india at NH-8 along Delhi-Gurgaon Border | Rites ltd. | Responsibility includes Traffic Analysis, Traffic Forecast along the project road and estimates of revenue. |
| 2006 | Amusement Park, Noida: Traffic Management of our project vis-à-vis Noida Authority Master Plan on Traffic, on the outer roads of our Amusement Park | Irppl international recreation parks pvt. Ltd. | Conduct of Traffic studies Traffic data analysis, Traffic Forecast Report preparation |
| 2006 | City Bus servicesin Amritsar, Ludhiana and Jalandhar | IL&FS INFRASTRUCTURE DEVELOPMENT CORPORATION LTD | Conduct of Traffic studies Traffic data analysis, Traffic Forecast Report preparation |
| 2009 | Detailed project reports for Three Metro Corridors Kolkata for financial proposal for carrying out preparation of Traffic dispersal and Inter-modal integration plans | RITES LTD | To prepare plans for traffic dispersal and integration at the proposed stations. To prepare traffic circulation plans for influence area of each station |
| 2007 | Transport Demand Forecast study and development of an integrated road cum multi modal public transport network for NCT of Delhi | RITES LTD | Carrying out traffic surveys, Traffic demand forecasting, Economic analysis of network improvement as per irc guidelines |
| 2007 | Design of Bus Rapid Transit Corridors in Delhi-Jamia-Tilak Nagar and Nizamuddin bridge Nand Nagri Corridors | Rites ltd. | Carrying out traffic surveys, Traffic demand forecasting, Economic analysis of network improvement as per irc guidelines |
| 2006 | Conduction Household Interview Survey for Bangalore Metropolitan area for CTTP for Bangalore | RITES LTD | Carrying out house interviews surveys as per irc guidelines |
| 2005 | Traffic and Transport plan for Noida | RITES LTD | Carrying out traffic surveys, Traffic demand forecasting and Economic analysis of network improvement as per irc guidelines |
| 2010 | Traffic circulation and transport infrastructure plan for Connaught place in the context of the proposed redevelopment of New Delhi Railway Station | RITES LTD | To prepare alternative feasible conceptual layout plans for roads, junction, traffic circulation and transport interchange of the schemes developed by RITES Ltd. to meet the projected demand in the study Area and To prepared conceptual geometric layout plans for transport infrastructure proposals including design of grade separators and ad grade intersection for about 25 km road length at surface and 10 km of alternative road |
| 2009 | Preparation of Feasibility Report for elevated sub urban rail corridor Churchgate-Virar- Mumbai | RITES LTD | To prepare conceptual traffic diversion plans for about 24 proposed stations at surface level to direct the traffic during construction period. And To prepare traffic integration facilities for nine major stations and design of traffic circulation, pedestrian path and parking facilities |
| 2009 | Preparation of Feasibility Study and Detailed Project report for proposed ROB/RUB on Railway crossing of Chandan Nagar/Brij Nagar Jallandhar | MC Jalandhar | Feasibility study of the project. Preparation of drawing and submission to UTTIPEC. Preparation of presentation on power point. Preparation of model of the project |
| 2007 | Construction of Railway Underpass at Railway crossing between Shalimar Bagh and Azadpur Fruit Mandi | PWD Delhi | Preparation of Geometric Design of the project |
| 2007 | Underground Parking for DHQ near South Block and North Block office complexes | CPWD | Responsible for Planning Traffic Surveys, Analysis of results preparation Traffic Management schemes in influence area of the underground parking structures system design of parking and internal circulations schemes in the complex |
| 2007 | Traffic studies for High Capacity Bus System between Rajendra Place & Pragati Maidan in Delhi | MOTT Macdonald | Planning coordination of traffic studies. Preparation of Data Analysis report |
| 2007 | Planning of Bus Routes along densely developed roads in cities of Amritsar, Jallandhar and Ludhiana on Public- Private Partnership basis. | ILFS, IDC | Planning of bus routes along densely developed roads in cities of Amritsar, Jallandhar and Ludhiana on Public-Private Partnership basis. |
| 2007 | Traffic studies for High Capacity Bus System between Jamia – Tilak Nagar in Delhi | Rites Ltd. | Planning coordination of traffic studies and Preparation of Data Analysis report |
| 2006 | Traffic Impact Assessment of two malls and Theme parks in NOIDA | IRPPL Pvt Ltd | Traffic Studies ,Parking Studies , Impact Assessment , Impact Mitigation, |
| 2006 | Widening and strengthening of NH-4 between Hoskote and Mulbagal in Karnataka | NHAI | Traffic Studies, Data Processing, Traffic Forecast, Economic Analysis and Report Writing |
| 2006 | Feasibility Study and Detailed Project Report for Four/Six laning from Bangalore-Hoskote-Kolar-Mudbagal of NH-4 in the State of Karnataka under NHDP Phase III Programme | NHAI | Collection and analysis of traffic data for rural road network and related data on socio-economic base line; Review of DPR; Confirm Sub-project identification and techno-economic screening procedures for Phase 2 & 3, selection of roads and Preparation of relevant reports |
| 2005 | Implementation of Institutional Strengthening Strategy for Tamil Nadu State Highways | SMEC (I) Pvt. Ltd. | Collection and analysis of traffic data for rural road network and related data on socio-economic base line; Review of DPR; Confirm Sub-project identification and techno-economic screening procedures for Phase 2 & 3, selection of roads and Preparation of relevant reports |
| 2004 | Independent Engineer (Traffic) for Widening and Strengthening of 93 Km Long Section of NH-45 between Tambaram and Tindivanam on Annuity Basis for MSV International Inc. | National Highways Authority of India | Review of the traffic studies. Checking traffic forecast as estimated in the DPR for the project. Checking safety/incidence management measures planned during construction and operations stage by concessionaire. Review of the Traffic Management plan during construction and in post construction stages. Review of engineering designs of intersections, access control measures, toll plaza and bus bays and suggest suitable modifications, wherever necessary. |
| 2004 | Feasibility study for improving the road network in Jawaharlal Nehru Port area in Mumbai | JNPT Authority | Carrying out traffic surveys, Traffic demand forecasting, Economic analysis of network improvement as per irc guidelines |
| 2003 | Preparation of Detailed Project Report for widening and strengthening of NH-24 Bypass between Km 3.400 and Km 8.500 in Delhi | PWD, Delhi | Carrying out traffic surveys, Data-analysis and interpretation, Design of At-grade and Grade separated intersections and Carrying out the economic analysis of the project. |
| 2003 | Household Surveys for Preparing DPR for Bangalore MRTS, Govt. of Karnataka | RITES Ltd. | Planning of surveys including the design of survey format, sampling scheme, selection of households for survey, training enumerators and conducting pilot surveys Customized programmes to analyze the household and travel characteristics of commuters in Bangalore. Involved in interpretation of analyzed data and report preparation. |