Welcome To

TPA ENGINEERING CONSULTANCY (I) PVT. LTD.

Welcome To

TPA ENGINEERING CONSULTANCY (I) PVT. LTD.

Welcome To

TPA ENGINEERING CONSULTANCY (I) PVT. LTD.

Welcome To

TPA ENGINEERING CONSULTANCY (I) PVT. LTD.

TPA Engineering Consultancy (I) Pvt. Ltd Since 1992

Main Services

Transportation Surveys

  • Household Surveys
  • Work Place surveys
  • Opinion surveys
  • Terminal surveys
  • Roadside Origin and Destination Surveys

About Us

TPA Engineering Consultancy (I) Pvt. Ltd.

TPA ENGINEERING CONSULTANCY (I) PVT. LTD. provides planning and designing consultancy services in the roads sector. We advise our esteemed clients about new road corridor planning and design, On the street and off-street parking solutions, Traffic Impact Assessments and Mitigation plans, design of At Grade and Grade Separated Intersections, Pedestrian Facilities, Low-cost Traffic Management solutions, Traffic Diversions during construction of Rail and Road projects, Landscaping and corridor restoration along and railroad corridors, Road Safety Audit and Accident Black spot Improvements. We have an in-house team to provide ancillary services like Traffic and Topographic Surveys and also to carry out cost estimations.

We have been engaged in this challenging domain for more than 32 years and have carried out numerous studies of varying scales to meet specific customer requirements. We started as a partnership firm in the year 1992 and became a private limited entity in the year 1999.

Major Works Completed

Last 5 Years

Corridor Improvement Project

  • Rani Jhansi Road , New Delhi
  • Vishvakarma Marg, Noida
  • Udyog Marg, Noida
  • Noida Expressway between Sector 14 and Mahamaya Flyover

Design of Intersections

  • At either ends of New Dhalli tunnel in Shimla
  • Kasna Intersection along S.K. Road in Greater Noida
  • Redesign of 22 intersection s along Ring Road and Outer Ring Road in Delhi for improving Intersection capacity.
  • Design of intersection of Ghangola Village, Grater Noida.
  • Design of internal intersections in Trans Ganga City In Unnao and Saraswati Vihar in Naini Allahabad Uttar Pradesh

Traffic Management Scheme during Construction

  • Entire Corridor of Metro project during Phase 3 of Delhi Metro
  • Phase 4 of DMRC including DC-01,02,04,05 07,09
  • Kanpur Metro – KP 05, KP-06, KP-07, KP-11
  • Lucknow Metro LM-01 , LM 02
  • Patna Metro PC-01 and PC 03

Traffic Impact Assessment

  • Multi Functional Campus at Whitefield-AECOM Bangalore
  • Bus Terminal Redevelopment –Nehru Place Bus Terminal- RSMS Architects, New Delhi
  • Redevelopment of Housing Project- Kirti Nagar- TARC Projects
  • Redevelopment of Commercial complex at Pitampura Mall, Sikka Associates
  • Educational- Ambedkar University Sector 3. Sikka Associates
  • SEZ Extension projects at Delhi, Hydrabad and Chenna, for DLF Developers
  • Construction of Multi Level Manufacture Hub in Delhi at Ranikhera, Sikka Associates

Road Safety Audits

  • Improvement of 16 accident Blackspot in Noida
  • Safety Audit of MDR road project in Uttar Pradesh
  • Improvement of 9 Accident Blackspot in Delhi.
  • Road Safety audit of Poorvanchal Expressway ,UP
  • Road Safety audit of 6 road corridors around Raipur town , Chattisgarh

Parking Design

  • Traffic circulation and parking improvement for Town Central commercial complex by PKS Build Mart in Noida Extension.
  • Parking and Circulation design for Residential quarters of Members of Parliament at Baba Khad Singh Marg .
  • Multilevel Parking design of Indore & Dehradun.

Multi Modal Integration

  • Design of Multi Model Logistic Hub at Gr. Noida.
  • Multi Model Integration plan at Ajni Station Nagpur.
  • Typical Multi Modal Integration plans for Four Metro Stations at Airport- Kanjur Marg Mumbai.
  • Multi Model integration at Metro Stations along the 3 Metro Corridors Kolkata.
  • Traffic Studies for IMC Hisar and IMC Agra

Pedestrian Infrastructure

  • Feasibility study for 6 Foot Over Bridges at Greater Noida.
  • Feasibility Study for 20+Footover Bridger locations in Delhi & Noida.

Feasibility & DPR

  • Feasibility Study of Economic Corridor between Akshardham and Eastern Peripherial Expressway
  • Traffic Management plan for redevelopment of Dehradun Railway Station
  • Traffic design for Redevelopment of Staff Colony, Azadpur

Corridor Improvement Project

  • Rani Jhansi Road , New Delhi
  • Vishvakarma Marg, Noida
  • Udyog Marg, Noida
  • Noida Expressway between Sector 14 and Mahamaya Flyover

Design of Intersections

  • At either ends of New Dhalli tunnel in Shimla
  • Kasna Intersection along S.K. Road in Greater Noida
  • Redesign of 22 intersection s along Ring Road and Outer Ring Road in Delhi for improving Intersection capacity.
  • Design of intersection of Ghangola Village, Grater Noida.
  • Design of internal intersections in Trans Ganga City In Unnao and Saraswati Vihar in Naini Allahabad Uttar Pradesh

Traffic Management Scheme during Construction

  • Entire Corridor of Metro project during Phase 3 of Delhi Metro
  • Phase 4 of DMRC including DC-01,02,04,05 07,09
  • Kanpur Metro – KP 05, KP-06, KP-07, KP-11
  • Lucknow Metro LM-01 , LM 02
  • Patna Metro PC-01 and PC 03

Traffic Impact Assessment

  • Multi Functional Campus at Whitefield-AECOM Bangalore
  • Bus Terminal Redevelopment –Nehru Place Bus Terminal- RSMS Architects, New Delhi
  • Redevelopment of Housing Project- Kirti Nagar- TARC Projects
  • Redevelopment of Commercial complex at Pitampura Mall, Sikka Associates
  • Educational- Ambedkar University Sector 3. Sikka Associates
  • SEZ Extension projects at Delhi, Hydrabad and Chenna, for DLF Developers
  • Construction of Multi Level Manufacture Hub in Delhi at Ranikhera, Sikka Associates

Road Safety Audits

  • Improvement of 16 accident Blackspot in Noida
  • Safety Audit of MDR road project in Uttar Pradesh
  • Improvement of 9 Accident Blackspot in Delhi.
  • Road Safety audit of Poorvanchal Expressway ,UP
  • Road Safety audit of 6 road corridors around Raipur town , Chattisgarh

Parking Design

  • Traffic circulation and parking improvement for Town Central commercial complex by PKS Build Mart in Noida Extension.
  • Parking and Circulation design for Residential quarters of Members of Parliament at Baba Khad Singh Marg .
  • Multilevel Parking design of Indore & Dehradun.

Multi Modal Integration

  • Design of Multi Model Logistic Hub at Gr. Noida.
  • Multi Model Integration plan at Ajni Station Nagpur.
  • Typical Multi Modal Integration plans for Four Metro Stations at Airport- Kanjur Marg Mumbai.
  • Multi Model integration at Metro Stations along the 3 Metro Corridors Kolkata.
  • Traffic Studies for IMC Hisar and IMC Agra

Pedestrian Infrastructure

  • Feasibility study for 6 Foot Over Bridges at Greater Noida.
  • Feasibility Study for 20+Footover Bridger locations in Delhi & Noida.

Feasibility & DPR

  • Feasibility Study of Economic Corridor between Akshardham and Eastern Peripherial Expressway
  • Traffic Management plan for redevelopment of Dehradun Railway Station
  • Traffic design for Redevelopment of Staff Colony, Azadpur

Connect With Us

5 + 7 =

TPA Engineering Consultancy (I) Pvt. Ltd.

AWESOME FACTS

Project Completed

SATISFIED CLIENTS

Our Clients